Integrated solar power plant Ferrostil Mont“ MF-2023-1-1-175

Project name: “Integrated solar power plant Ferrostil Mont” MF-2023-1-1-175

Project manager: Ferrostil Mont d.o.o.

With this project, the company Ferrostil Mont built an integrated photovoltaic power plant in a network facility for the production of electricity for its own needs.

Photovoltaic modules are installed on the roof of the production hall, whereby the efficiency of the photovoltaic modules is 20.97%, and the installed power of the photovoltaic system is 418.2 kW. According to the Main Project, the annual production of photovoltaic power plants will be about 435,575 kWh, which will ensure a reduction of the delivered amount of energy on an annual level by 59.16% compared to the reference year 2022.

The project “Integrated solar power plant Ferrostil Mont” marked MF-2023-1-1-175 began in June 2023 and was completed in October 2024. It was co-financed by means of the Modernization Fund based on the Agreement with the Ministry of Economy and Sustainable Development and the Fund for Environmental Protection and Energy Efficiency, in the amount of €216,923.00.

Project value: €309,890.00

Amount of EU co-financing: €216,923.00

Project implementation period: June 17, 2023. – 10.10.2024.

“Co-financed from the EU Emissions Trading System (Modernization Fund)”